It's going to be a busy Easter, with only 3 weeks to go to the London marathon I'm trying to fit in my training ( have you sponsored me??) , a bit of scuba diving, and we are finishing up the testing on the new version of Uplink, together with the new 2B firmware. All appears to be working, I just need to sort out the manuals... And yes you can update from 2.09!!!!
Wayne
- Posted by finger from my wireless communicator thingy
Welcome to the blog of the multi award winning E-Stim Systems. We work to create the ultimate in electro stimulation pleasure.
Find it all at https://www.e-stim.co.uk and https://www.e-stimsystems.com
Thursday, 28 March 2013
Tuesday, 26 March 2013
UpLink 2 on its way
We are now doing the final production testing of the new firmware for the 2B version 2.104. The biggest change is this is out first implementation of our new bootloader system so updates are far more reliable and considerably easier to apply, and we are offering the update in a Mac version as well as PC.
- Posted by finger from my wireless communicator thingy
- Posted by finger from my wireless communicator thingy
Saturday, 16 March 2013
Busy weekend
It's a busy weekend this weekend, with Nick manning our stand at the Birmingham bizzare bizzar on Sunday, Caz is running 2.4km in the green park challenge and I'm running a half marathon around Reading.
I might even get some time to play with the new code for the 2B... Yes it's coming!!!!
Wayne
- Posted by finger from my wireless communicator thingy
I might even get some time to play with the new code for the 2B... Yes it's coming!!!!
Wayne
- Posted by finger from my wireless communicator thingy
Tuesday, 12 March 2013
Bootable 2b
Busy day today. The new bootloader is working with to be released soon 2.104 firmware.. I just need to finish Uplink2 and get it out to the test team. The result will be a software updateable 2B that is difficult to 'brick' ... You can even unplug the link during the update and all you need to do is restart the bootloader ... Then I can move onto adding all the new bits planned for the 2B watch this space!!!
Wayne
- Posted by finger from my wireless communicator thingy
Wayne
- Posted by finger from my wireless communicator thingy
Saturday, 9 March 2013
And & Dec Try Electrogolf
Tuesday, 5 March 2013
Busy packing
It's been a busy day at E-Stim HQ, with the electricians in fitting the supplies for some new hard core packing machines, and then our new sexy labels arrived.
Watch this space for some new packaging.
Wayne Allen
Director E-Stim Systems Ltd
Watch this space for some new packaging.
Wayne Allen
Director E-Stim Systems Ltd
Location:Watford
Friday, 1 March 2013
LAM demos and training
Well Nick from DOMestics will be at the LAM this weekend with a electrics demo at 2pm on Sunday, about the same time I will be running in a half marathon around silverstone race track as part of my London marathon training....
- Posted by finger from my wireless communicator thingy
- Posted by finger from my wireless communicator thingy
Subscribe to:
Posts (Atom)